Trace each release decision back to its baseline and evidence.

Mekai Labs links deployment work, test runs, evidence, decisions, and handover.

Baseline to handover.

  1. 01Site
  2. 02Asset and configuration
  3. 03Validation baseline
  4. 04Readiness and commissioning
  5. 05Verification run
  6. 06Evidence
  7. 07Reviewer decision
  8. 08Release and handover package

What teams can manage.

  • Versioned baselines
  • Site readiness
  • Commissioning
  • Release gates
  • Verification runs
  • Evidence review
  • Reviewer decisions
  • Sign-off follow-up
  • Package export

Recorded against each check.

Pass
The declared check met its stated condition using the available evidence.
Fail
The declared check did not meet its stated condition.
Not verifiable
The available evidence is insufficient or unsuitable for a defensible result.
No recorded result
No result was captured for the declared check.

Evidence sources.

Recorded evidence

MCAP · rosbag2 · CSV · TSV · JSONL · TXT · LOG

Imported project evidence

Controller logs · PLC exports · WMS/FMS event exports · FAT/SAT records · configuration records

Site connections

VDA 5050 over MQTT · OPC UA read-only

Standards and test procedures

ISO 10218-2 · ISO/TS 15066 · ISO 12100 · ISO 13849-1 · IEC 60204-1 · ISO 3691-4 · VDA 5050 · buyer FAT/SAT procedures

Review one current deployment.

Bring the baseline, commissioning steps, evidence, and release decision.