Trace each release decision back to its baseline and evidence.
Mekai Labs links deployment work, test runs, evidence, decisions, and handover.
Deployment workflow
Baseline to handover.
- 01Site
- 02Asset and configuration
- 03Validation baseline
- 04Readiness and commissioning
- 05Verification run
- 06Evidence
- 07Reviewer decision
- 08Release and handover package
Deployment Assurance
What teams can manage.
- Versioned baselines
- Site readiness
- Commissioning
- Release gates
- Verification runs
- Evidence review
- Reviewer decisions
- Sign-off follow-up
- Package export
Result states
Recorded against each check.
- Pass
- The declared check met its stated condition using the available evidence.
- Fail
- The declared check did not meet its stated condition.
- Not verifiable
- The available evidence is insufficient or unsuitable for a defensible result.
- No recorded result
- No result was captured for the declared check.
Inputs
Evidence sources.
Recorded evidence
MCAP · rosbag2 · CSV · TSV · JSONL · TXT · LOG
Imported project evidence
Controller logs · PLC exports · WMS/FMS event exports · FAT/SAT records · configuration records
Site connections
VDA 5050 over MQTT · OPC UA read-only
Standards and test procedures
ISO 10218-2 · ISO/TS 15066 · ISO 12100 · ISO 13849-1 · IEC 60204-1 · ISO 3691-4 · VDA 5050 · buyer FAT/SAT procedures
Deployment review
Review one current deployment.
Bring the baseline, commissioning steps, evidence, and release decision.